curiosity

Industry

Work safely across
systems and sites

Assets outlive the paperwork systems that documented them. The procedure in force, the last inspection and the license condition that governs both are rarely in the same place.

  1. Source 01 Procedures
  2. Source 02 Work orders
  3. Source 03 Configuration records
  4. Source 04 License conditions

The problem

Your answers already exist. They are spread across decades of systems.

Infrastructure work is governed by procedures and license conditions, executed through work orders, and recorded against assets whose documentation predates every current system. Getting the right answer on site means knowing where each piece lives.

An example question, answered from four connected sources Asked: Can we isolate pump P-14 during next week's outage? Answer: Yes, under procedure OP-221 rev 6. Work order 77104 lists the isolation points. Two sign-offs are required. Sources: OP-221, rev 6 (procedures), Work order 77104 (work orders), Pump P-14, as built (configuration records), License condition 4.3 (license conditions). Can we isolate pump P-14 during next week's outage?| STUDIO EXAMPLE Yes, under procedure OP-221 rev 6. Work order 77104 lists theisolation points. Two sign-offs are required. SOURCES PROCEDURES OP-221, rev 6 WORK ORDERS Work order 77104 CONFIGURATION RECORDS Pump P-14, as built LICENSE CONDITIONS License condition 4.3
An example question, answered from four connected sources Asked: Can we isolate pump P-14 during next week's outage? Answer: Yes, under procedure OP-221 rev 6. Work order 77104 lists the isolation points. Two sign-offs are required. Sources: OP-221, rev 6 (procedures), Work order 77104 (work orders), Pump P-14, as built (configuration records), License condition 4.3 (license conditions). Can we isolate pump P-14 during next week'soutage?| STUDIO EXAMPLE Yes, under procedure OP-221 rev 6. Workorder 77104 lists the isolation points.Two sign-offs are required. SOURCES PROCEDURES OP-221, rev 6 WORK ORDERS Work order 77104 CONFIGURATION RECORDS Pump P-14, as built LICENSE CONDITIONS License condition 4.3

What changes

Find procedures and records fast

01

Procedures, current

The version in force for this asset, not the one that came up first in search.

02

Configuration kept current

Design and as-built records connected, so the difference between them is visible.

03

Know what the license requires

Conditions connected to the assets and activities they actually govern.

In practice

Where safety and knowledge meet

In this sector the cost of the wrong record is not a wasted afternoon.

  1. 01

    Failure investigations

    Asset history and prior investigations assembled rather than searched for.

  2. 02

    Work order context

    What was done last time, by whom, and what they found when they opened it.

  3. 03

    Regulatory questions

    Answered from the record, with the evidence attached.

Security

Built for security

Made in Germany and built for data sovereignty. Your data stays in your environment, encrypted and access controlled down to the individual record.

On premises or private cloud

Deploy on your own infrastructure or in certified data centers in Europe.

Single sign on and enforced MFA

Access synced to your data sources with relationship based permissions.

Full audit trail

Every query, download and data access logged.

Data residency

Your data stays in the region you choose.

Made in Germany

Built in Munich.

GDPR compliant

European data protection standards.

Your data. Your infrastructure.

Connected knowledge across the estate