curiosity

Industry

Across platforms,
projects and approvals

A fleet is a set of variants that are almost the same. The differences are what matter, and they are recorded across projects that were run years apart by different teams.

  1. Source 01 Specifications
  2. Source 02 Design and changes
  3. Source 03 Approval evidence
  4. Source 04 In-service issues

The problem

The record you need already exists. It is just never in one place.

Approval bodies ask questions that span the whole history of a variant. Answering them means assembling evidence from project archives, supplier records and maintenance systems that were never designed to be read together.

An example question, answered from four connected sources Asked: What has changed on the variant B bogie since type approval? Answer: Two design changes and one in-service fix. Both changes carry approval evidence. The fix does not yet. Sources: Bogie spec, variant B (specifications), CR-118 and CR-131 (design and changes), Type approval file (approval evidence), Issue IS-405 (in-service issues). What has changed on the variant B bogie since type approval?| STUDIO EXAMPLE Two design changes and one in-service fix. Both changes carryapproval evidence. The fix does not yet. SOURCES SPECIFICATIONS Bogie spec, variant B DESIGN AND CHANGES CR-118 and CR-131 APPROVAL EVIDENCE Type approval file IN-SERVICE ISSUES Issue IS-405
An example question, answered from four connected sources Asked: What has changed on the variant B bogie since type approval? Answer: Two design changes and one in-service fix. Both changes carry approval evidence. The fix does not yet. Sources: Bogie spec, variant B (specifications), CR-118 and CR-131 (design and changes), Type approval file (approval evidence), Issue IS-405 (in-service issues). What has changed on the variant B bogiesince type approval?| STUDIO EXAMPLE Two design changes and one in-servicefix. Both changes carry approvalevidence. The fix does not yet. SOURCES SPECIFICATIONS Bogie spec, variant B DESIGN AND CHANGES CR-118 and CR-131 APPROVAL EVIDENCE Type approval file IN-SERVICE ISSUES Issue IS-405

What changes

Connect specs, designs and changes across variants

01

Variants, tracked

What differs between two builds, and which change record explains it.

02

Approval evidence together

The pack assembled from source records, with each claim traceable to the document behind it.

03

Trace to source

A non-conformance followed back through design and supply to where it originated.

In practice

In service, not just in design

The vehicle spends decades in service. Most of the questions arrive then.

  1. 01

    Depot-side answers

    The full vehicle context available to whoever is standing next to it.

  2. 02

    Fleet-wide patterns

    An issue on three units in two depots recognized as one problem.

  3. 03

    Evidence on request

    What the approval body asked for, produced from records rather than reconstructed.

Security

Built for security

Made in Germany and built for data sovereignty. Your data stays in your environment, encrypted and access controlled down to the individual record.

On premises or private cloud

Deploy on your own infrastructure or in certified data centers in Europe.

Single sign on and enforced MFA

Access synced to your data sources with relationship based permissions.

Full audit trail

Every query, download and data access logged.

Data residency

Your data stays in the region you choose.

Made in Germany

Built in Munich.

GDPR compliant

European data protection standards.

Your data. Your infrastructure.

Connected knowledge across the fleet